CEDD Signed Contract for Tung Chung New Town Extension – Siu Ho Wan Fresh Water Service Reservoir and Associated Mainlaying Works

2021.07.21

The Civil Engineering and Development Department signed a contract of about HK$ 383 million on 21 July 2021 with China Geo-Engineering Corporation for carrying out infrastructure works under the Tung Chung New Town Extension project.

The works mainly include:-

  1. Construction of Siu Ho Wan Fresh Water Service Reservoir with storage capacity of about 64,600 cu.m;
  2. Construction of an access road from Siu Ho Wan Water Treatment Works to Siu Ho Wan Fresh Water Service Reservoir;
  3. Laying of about 1,500 m long fresh watermains;
  4. Site formation and slope stabilization works; and
  5. Associated civil, geotechnical, structural, building services systems, electrical and mechanical engineering and landscaping works.

The works commenced on 15 July 2021 for completion in 2024.


Back